Warning

You are reading an old version of this documentation. If you want up-to-date information, please have a look at 2024.5 .

Maintenance

Periodic maintenance schedule

The Asyfill is largely maintenance-free, however, simple inspections should be done at regular intervals to ensure optimal performance, and safety operating of your product.

Table 15 Periodic maintenance schedule

Item

Period

References

Calibration of the machine

6 months or 180 hours of vibration

refer to calibration procedure

Control of fixation screws

Month

refer to control of fixation screws

Important

There are no user serviceable parts inside the product. Contact Asyril or your local supplier to effect maintenance. In cases of non-compliance, the product guarantee will expire.

Caution

../_images/danger_electric.png

Power down the system and unplug all cables, let the system cool down for 10 minutes before any kind of maintenance.

Note

The information given in this table is only informative, maintenance and times must be modified by the operator in accordance with your particular system, its operating environment and the amount of usage.

Control of fixation screws

We recommend to check the correct tightening of the fixation screws of the Asyfill (4x M6) and the fixation screws of the container (4x M6). Loose screws can lead to incorrect machine behavior and premature wear.